Phase 2 began with the forming and pouring of the right hand side of the foundation wall on which the Memorial Wall would be placed.

Phase 2 continues with the pouring of the left half of the elipse

Phase 2 Continues With the mounting of The Wall on the foundation

Phase 2 continues with the Cement walkway and wheelchair access to the grounds 