Phase 2 began with the forming and pouring of the right hand side of the foundation wall on which the Memorial Wall would be placed.
Phase 2 Right side
Volunteers working on forms for the foundation
Phase 2 Right side
Cement workers smoothing out foundation
Phase 2 right side
Phase 2 Right side
Volunteers working on forms for the foundation
1/33
Phase 2 continues with the pouring of the left half of the elipse
Phase 2 Left side
Prepared forms ready for pouring
Phase 2 Left Side
Relaxing before work begins
Phase 2 Left Side
Phase 2 Left side
Prepared forms ready for pouring
1/43
Phase 2 Continues With the mounting of The Wall on the foundation
Phase 2 Mounting The Wall
Phase 2 Mounting The Wall
Phase 2 Mounting The Wall
Phase 2 Mounting The Wall
1/23
Phase 2 continues with the Cement walkway and wheelchair access to the grounds
Phase 2 Walkway
Phase 2 Walkway
Phase 2 Walkway
Phase 2 Walkway
1/12